Filmlexikon.
Support
Stunt Rigging
Stunts · Terms

Stunt Rigging

Murnau AI illustration
chain gang contortion dwarfs flying rig stunt stunt coordinator waterfall

Planning and rigging of wire, cable, and safety systems for stunts — wire flies, falls, ratchets. Engineered, load-tested, and signed off — never estimated.

Stunt Rigging is the technical substructure of any stunt where someone is held, pulled, or secured. It involves statics and rope techniques, not improvisation: loads are calculated, anchor points are checked, and systems are approved.

What is Built

  • Safety Systems for working at height — safety harness, rope, anchor point.
  • Flight Systems for controlled movements through space, using ropes and winches.
  • Ratchets — pulling systems that abruptly yank a performer, for example, during explosions or impacts.

What is Non-Negotiable About It

  • Anchor Points are proven, not assumed. A ceiling structure whose load capacity is unknown is not an anchor point.
  • Safety Factors according to standards, not according to feeling.
  • Inspection Before Every Take, even if nothing has been changed.
From the crafts

Perspectives

Director

Creative or operational relevance to directing

Producer

Importance in production planning and execution

More in the lexikon

Related terms

Test your knowledge

Quiz

1. Was beschreibt „Stunt-Rigging" am besten?

2. Zu welchem Department gehört „Stunt-Rigging"?

3. Wie viele verschiedene Fachperspektiven bietet dieser Eintrag?

Report an error
From the Filmfarm ecosystem

Understand visual language, budget productions, connect crew.

The Lexikon is part of the Filmfarm ecosystem — alongside budgeting (FilmBalance), an industry magazine (FilmCircus) and crew networking (FilmCall, CrewMesh). One shared vocabulary for the whole production.

FilmFarm FilmRadarComing soonFilmPulseComing soonFilmNumbersComing soonFilmCapitalComing soonFilmLabComing soonFilmBalanceComing soonFilmCircusComing soon